Skip to content

Leave planner · teams of any size · any country

Leave balances nobody has to argue about.

The leave planner for teams of any size, in any country. Everyone books time off in one place, managers see who’s covering before they say yes, and every balance shows how it adds up.

Clearleave launches on 1 January 2027. Book your place and we’ll email you on launch day.

Same December, wiped clean

Now it adds up.

The wall planner showed who stuck a dot where. Clearleave counts each person’s working days, leaves out their office’s public holidays, and shows the manager who’s covering before anyone says yes.

  • 7 daysnot 11. Priya’s dots on Christmas Day, the weekend and the Boxing Day substitute day were never days of leave.
  • 3 of 5Support away on 29–31 Dec, over the limit of 2. Thabo saw it before he said yes.
  • 12.5 daysleft for Priya, and a receipt that shows how it adds up.
A laminated wall planner for December 2026, with coloured dot stickers for each person’s days off. Priya’s eleven dots run from 21 to 31 December, over Christmas Day, a weekend and the Boxing Day substitute day. Chris stuck new dots over his old ones, Aubrey’s pending dot is half peeled, and nobody has counted who is covering Support. Switch to “With Clearleave” to see the same month as Clearleave’s Wallchart: Priya’s dots are 7 working days, and Support is 3 of 5 away on 29 to 31 December, over its limit of 2.

The same December, before and after. Switch to see it counted.

Same Wallchart · the whole of 2026

The planner only ever showed a month. Clearleave shows the year.

Every person, every office’s public holidays, every day of the year in one place. Move to any three weeks, then drag across a row to book time off.

Wallchart9 – 29 Nov 2026Support · Operations · Engineering
2026Who’s off, every day
Support away
001100023200000
LNLerato NdlovuLerato N.EngineeringCPT
Parental leave
TMThabo MokoenaThabo M.OperationsCPT
Annual
ETEmma ThompsonEmma T.SupportLON
Sick
ABAubrey BennettAubrey B.SupportLON
Pending
CBChris BellChris B.SupportLON
Annual
KPKiri ParataKiri P.SupportAKL
Annual
PSPriya SharmaPriya S.SupportLON

Drag across any row to book time off. Or focus a row and use the arrow keys.

One request, start to finish

01 · Pick dates

Pick the dates. We’ll do the counting.

Priya asks for 21 to 31 December, the same eleven dots she stuck on the planner. Clearleave counts 7 working days. It skips the weekend, Christmas Day and the Boxing Day substitute day, because her office uses the UK’s public holidays.

New request · Annual leavePSPriya Sharma · London office

December 2026

7 working days

  • Fri 25 Dec · Christmas Day · skipped
  • Sat 26 – Sun 27 Dec · weekend · skipped
  • Mon 28 Dec · Boxing Day (substitute day) · skipped
Mon 21 – Thu 31 Dec · 7 days

02 · Check cover

Who’s covering? Asked before, not after.

Before anyone says yes, the request is checked against the team. Emma and Chris are already off that week, so Support would be 3 of 5 away. Cover checks run by department, and by role or skill on Pro.

Wallchart · Support21 – 31 Dec 2026

Coverage check · Tue 29 Dec

Support: 3 of 5 away if approved. Limit is 2.

Aubrey and Kiri are in.

03 · Decide

Say yes with the facts in view.

Thabo sees the balance, the cover and the public holidays on one card. He approves anyway and says why. On Pro, a request can go through more than one approver.

PS

Priya Sharma · Support

Annual leave · requested 2 Nov

Approved
Mon 21 – Thu 31 Dec · 7 days
  • Enough balance · 19.5 → 12.5 days
  • Support: 3 of 5 away on 29–31 Dec · limit is 2
  • Public holidays skipped · Christmas Day, Boxing Day (substitute day)

Thabo’s note to Priya

Kiri is covering the phones on 29–31 Dec. Enjoy the break.

Priya’s leave is approved. She has 12.5 days left.

04 · See the balance

12.5 days left

days left. Here’s how it adds up.

Every balance shows how it adds up, and every change is kept with its reason. Nobody has to ask, and nobody has to argue.

Priya Sharma · Annual leave 2026How it adds up
  • Granted for 2026+25.01 Jan · policy: Standard
  • Carried over from 2025+3.0Carry-over cap: 5 days
  • Carry-over expired 31 Mar−1.0Unused carry-over expires after 3 months
  • Taken so far−7.53 requests
  • Booked · Mon 21 – Thu 31 Dec−7.0Approved by Thabo Mokoena · “Kiri is covering the phones”

Available to book12.5 days days

Every change kept, with its reason

Public holidays for 200+ countries

Same dates. Different answers.

Every office gets its own public holiday calendar, so the same week off costs what it really costs, wherever your people work.

LondonUnited Kingdom8 weekday public holidays in 2026
London: 7 working days, skipping Christmas Day, Boxing Day (substitute day)
Cape TownSouth Africa10 weekday public holidays in 2026
Cape Town: 8 working days, skipping Christmas Day
AucklandNew Zealand11 weekday public holidays in 2026
Auckland: 7 working days, skipping Christmas Day, Boxing Day (substitute day)
MadridSpain7 weekday public holidays in 2026
Madrid: 8 working days, skipping Christmas Day
AustinUnited States11 weekday public holidays in 2026
Austin: 8 working days, skipping Christmas Day

  • One calendar per office
  • Nine countries set up at sign-up: UK, Ireland, US, Canada, Australia, New Zealand, South Africa, Singapore, India
  • Leave rules built in for the UK and South Africa
  • One price, in US dollars

Switching

Bring the history. Leave the stickers.

Put past leave in a spreadsheet, or export it from Timetastic, and import it with your people. Every row is checked before it’s saved. The switching guide walks you through it, there’s more on moving from Timetastic, and you can email us if you get stuck.

  • A spreadsheet
  • A Timetastic export

1,835 bookings imported. The 7 rows that couldn’t come across are listed, each with the reason.

leave-history-2021-2026.csv1,842 rows
A sample of rows being checked during an import
Checkemployeestarttyperesult
Importedpriya.sharma@2025-12-22Annual4 days
Importedthabo.mokoena@2026-03-30Annual3 days
Not importedkiri.parata@14/04/2026AnnualDate isn’t yyyy-mm-dd
Importedemma.thompson@2026-05-26Sick2 days
Not importedsam.jones@2026-06-08AnnualNot set up yet
Importedchris.bell@2026-08-17Annual0.5 days

Pricing

From $1.50 a person. Stickers not included.

One price in US dollars, the same in every country. Per person a month, plus tax. Try every Pro feature free for 30 days, no card needed.

Core $1.50

  • Wallchart, requests and approvals
  • Cover checks by department
  • Public holidays for 200+ countries, per office
  • Balance history for every change
  • Import from a spreadsheet or Timetastic

Pro $2.50, or $2.00 billed annually

  • Everything in Core
  • Cover checks by role or skill
  • Approvals with more than one step
  • Custom accrual, carry-over and expiry
  • Blackout dates

Your data is stored in the EU, in Frankfurt, wherever your team is.

25 people at $1.50 is $37.50 a month, plus tax.

What a team pays a month, plus tax. Same price per person at any size.
PeopleCoreProPro, billed annually
10$15.00$25.00$20.00
50$75.00$125.00$100.00
250$375.00$625.00$500.00
Get early access

Clearleave launches on 1 January 2027. Book your place and we’ll email you on launch day.

Questions

Before you take the planner down.

Is there a free plan?

No. Every new account gets 30 days of every Pro feature, free, with no card. After that, Core ($1.50 per person a month) covers what most teams need: the Wallchart, requests and approvals, part-time allowances, public holidays, department coverage limits, balance history, reports and the CSV import.

Does Clearleave work in my country?

Yes, if your team works in English. Public holidays for 200+ countries are built in, down to state or region, and each office can follow its own calendar. In nine countries, including the UK, the US, Australia and South Africa, your public holidays and a starting allowance are set up when you sign up. You then change the allowance to match your contracts. Leave rules for the UK and South Africa are built in; elsewhere, you set your own leave types and policies. Prices are in US dollars, the same everywhere.

How much does it cost?

Core is $1.50 per active employee per month, billed monthly, so a 25-person team pays $37.50 a month plus tax. Pro adds multi-step approvals and escalation, cover by job role and skill, custom accrual and carry-over, and blackout dates, at $2.50 per active employee per month billed monthly, or $2.00 billed annually. Archived leavers don’t count.

What happens when the trial ends?

Add payment details and choose Core or Pro to keep going. If you don’t, the account is suspended when the trial ends: your team can’t use it until the account owner subscribes. Nothing is deleted while it’s suspended, and owners and admins can still sign in to export your data.

Can I bring my leave history from another leave tool or a spreadsheet?

Yes. Import your people, then past leave from any CSV with employee email, leave type, start date, end date and status. Clearleave checks every row before saving, counts working days from each person’s week, imports up to 2,000 rows per file, and lists any row it couldn’t import with the reason.

Which public holidays are included?

If you sign up in the UK, Ireland, the US, Canada, Australia, New Zealand, South Africa, Singapore or India, your country’s public holidays are set up for you. Calendars for 200+ other countries are available too, and each office can use its own, so people in another state, region or country get the right days. Public holidays are left out of day counts automatically.

Where is our data stored?

In the EU, in Frankfurt, Germany, with each company’s data kept separate from every other company’s. Leave records are kept for six years by default (longer where the law asks), then deleted. We sell to companies in any country; your data stays in the EU wherever you are. The security page has the full detail.

Do you have a mobile app or Teams integration?

Not yet, on either. There’s no app to install: Clearleave works in the browser on your phone, with a tab bar for home, the Wallchart, booking time off and approvals. There’s no Microsoft Teams integration. Requests and decisions arrive by email, each with a link straight to the request, and anyone can download their approved leave as a calendar file for Outlook, Google or Apple Calendar.

Take the planner down.

Run your next leave request in Clearleave. Add your team, book a real request and see how every balance adds up. 2027 is still a blank wall.

Clearleave launches on 1 January 2027. Book your place and we’ll email you on launch day.